Manufacturing Technology 2012, 12(2):242-247 | DOI: 10.21062/ujep/x.2012/a/1213-2489/MT/12/2/242
Value engineering as the way of quality problems solving in the steel construction management
- Institute of Production Engineering, Czestochowa University of Technology, Al. Armii Krajowej 19B, 42-200 Częstochowa, Poland
The study aim was discussion on the steel construction production with regard to quality problems and its analysis by using value engineering. The most important elements of the work should, however, discuss how an important factor for the company's production and quality management are. Based on this explicit purpose developed the following hypothesis: identification of the nonconformities location in the production process of steel constructions and its causes contributes to the production improvement. The research result is identification of nonconformities formation areas and presentation of the production process improvement methodology by applying of quality tools and value engineering idea as well. The research object was chosen company producing steel constructions for buildings. The examination research findings come from 2011 year.
Keywords: quality, production management, steel construction, quality, value engineering
Published: December 1, 2012 Show citation
References
- AGBEJULE A., FERNANDEZ M., D'ESPINEY S. (2004). Approaches to environmental value analysis of products, processes, and services. Management of Environmental Quality: An International Journal Vol. 15 No. 2. pp. 111-130. Emerald Publishing Limited.
Go to original source...
- BORKOWSKI S., STASIAK-BETLEJEWSKA R. (2010). Analysis of anti-corrosion coating process on steel constructions. Manufacturing Technology December, vol. X., pp.27 - 29. ISSN 1213-2489.
Go to original source...
- CARRILLO P., CHINOWSKY P. (2006). Exploiting knowledge management: the engineering and construction perspective. Journal of Management in Engineering. ASCE 22 (1). pp. 2-10.
Go to original source...
- GARRATT A., (1967). Value Engineering. Management Decision, Vol. 1 Issue 3 pp. 49 - 54.
Go to original source...
- GREEN S. (1990). The essentials of value engineering. Facilities. Vol. 8 Issue: 10 pp. 15 - 17
Go to original source...
- HOLESOVSKY F., NAPRSTKOVA N., NOVAK M. (2012). GICS for grinding process optimization. Manufacturing Technology June 2012, Vol. 12, M201205. pp. 22 - 26. ISSN 1213-2489.
Go to original source...
- JURAN, J.M., GODFREY A.B. (1998). Juran's Quality Handbook. McGraw-Hill. pp.18. ISBN 0-07-034003-X.
- KAMARA J.M., ANUMBA G.J., CARRILLO P.M. (2002). A clever approach to selecting a knowledge management strategy. International Journal of Project Management 20. pp. 205-211.
Go to original source...
- MICHNA, ©., LUKÁČ, I., NÁPRSTKOVÁ, N. (2009). Optimalizace mechanických vlastností u slitiny AlSi12CuMgNi. Strojírenská technologie ročník XIV/2. pp. 9-14ISSN 1211-4162.
- MILES, L.D. (1972). Techniques of Quality Control and Improvement. 2nd ed. McGraw Hill. pp.17-32. New York.
- RUIKAR K., ANUMBA C.J., CARRILLO P.M. (2005). End-user perspectives on use of project extranets in construction organizations. Engineering, Construction and Architectural Management Vol. 12. 3 pp. 222 - 235.
Go to original source...
- VAJSOVÁ, V., NÁPRSTKOVÁ, N. (2009). Structural Inhogomenity by Al-Cu Alloys Casting into Metal and Bentonic Form. In "10th International Scientific Conference Automation in Production Planning and Manufacturing, 4-6.5. Turčianské Teplice, SR. ISBN 978-80-554-0008-2.
- VAJSOVÁ, V., NÁPRTKOVÁ, N. (2009). The Homogenization Anealing of AlCu4MgMn Alloys [in] Borkowski S. Selejdak, J. Toyotarity. Realization of production/services processes., Dnipropetrovsk.
- TOWILL, D.R. (1997). Enabling Construction as a Manufacturing Process. Innovation in Civil and Construction Engineering. Edinburgh, pp. 145-51.
Go to original source...
- TUCKER, R. (1986). Management of construction productivity. Journal of Management Engineering, Vol. 2 No. 3, pp. 148-56.
Go to original source...
- XUEQING Z., XIAOMING M., SIMAAN M.A. (2009). Developing a knowledge management system for improved value engineering practices in the construction industry. Automation in Construction. 18. pp. 777-789.
Go to original source...
- WANG S., ARIGUZO G. (2004). Knowledge management through the development of information schema. Information & Management 41 (4). pp. 445-456.
Go to original source...
- NOVAK, M. (2012). Surfaces with high precision of roughness after grinding. In Manufacturing Technology, vol. 12., no. 12., UJEP, Usti nad Labem, 66-70 pp.
Go to original source...