Manufacturing Technology 2014, 14(2):125-130 | DOI: 10.21062/ujep/x.2014/a/1213-2489/MT/14/2/125

Transformation Methods of Production Organization from the Far East to the Metal Industry in Poland

Stanisław Borkowski, Paweł Szklarzyk, Krzysztof Knop
Institute of Engineering Production, Czestochowa University of Technology, Dąbrowskiego 69, 42-200 Częstochowa, Poland

Published: June 1, 2014  Show citation

ACS AIP APA ASA Harvard Chicago IEEE ISO690 MLA NLM Turabian Vancouver
Borkowski S, Szklarzyk P, Knop K. Transformation Methods of Production Organization from the Far East to the Metal Industry in Poland. Manufacturing Technology. 2014;14(2):125-130. doi: 10.21062/ujep/x.2014/a/1213-2489/MT/14/2/125.
Download citation

References

  1. BORKOWSKI, S.(2012). Toyotarity. BOST method as the instrument of assessment process functioning according to Toyota principles. Faculty of Logistics. University of Maribor Publisher. Celje.
  2. BORKOWSKI, S. (2012). Zasady zarządzania Toyoty w pytaniach. Wyniki badań BOST. PTM Publisher. Warszawa.
  3. BORKOWSKI, S. (2012). Toyotaryzm. Wyniki badań BOST. PTM Publisher. Warszawa.
  4. BORKOWSKI, S., STASIAK-BETLEJEWSKA, R., NÁPRSTKOVÁ, N. (2011) The Kaizen philosophy in the aluminium products improvement. In: Manufacturing technology.Vol. 11, pp. 2-5. Czech Republic. Go to original source...
  5. BORKOWSKI, S., ULEWICZ, R. (2008). Zarządzanie produkcją. systemy produkcyjne. Humanitas Publisher. Sosnowiec.
  6. DURLIK, I. (2007). Inżynieria zarządzania. Strategia i projektowanie systemów produkcyjnych cz. I. Placet Publisher. Warszawa.
  7. PN-EN ISO 9000:2006. Systemy zarządzania jakością. Podstawy i terminologia.
  8. KONSTANCIAK, M., BORKOWSKI, S., JAGUSIAK M. (2011). Supervisors' Assessment According to BOST Method in Chosen Polish Company. In: Communications. Vol. 4, pp. 58-62. Slovakia. Go to original source...
  9. LIKER, J. K. (2005). Droga Toyoty - 14 zasad zarządzania wiodącej firmy produkcyjnej świata. MT Biznes Publisher. Warszawa.
  10. Mario, F.C., Howell. G. (2012). Using production system design and Takt time to improve project performance. In: Conference paper: IGLC 2012 - 20th Conference of the International Group for Lean Construction.
  11. SZKLARZYK, P., KLIMECKA-TATAR, D., SYGUT, P. (2013). The meaning of "Toyotaryzm" in improving of the hot-rolled plates production process. In: Proceedings of Toyotarity. Management of the production values. (S. Borkowski, T. Grladinović (Ed.)), pp. 112-121. Savaş Kitap ve Yayinevi Publisher. Ankara, Türkiye.
  12. TAPPING, D., SHUKER, T. (2010). Zarządzanie strumieniem wartości w biurze. Osiem etapów doskonalenia procesów biurowych. ProdPublishing.com. Wrocław.
  13. ULEWICZ, R. (2003). Quality control system in production of the castings from spheroid cast iron. In: Metalurgija. Vol. 42, Issue 1, pp. 61-63. Croatia.